攀钢四高炉无料钟炉顶布料的操作实践
CHARGING PRACTICE OF BELL-LESS TOP ON No.4 BF OF PANZHIHUA IRON AND STEEL Co.
-
Abstract: This report discribes the measured charging results in blow-in at PISC's No.4 BF.The charging operation of bell-less top on No. 4 BF is discussed and suitable operation parameters of bell-less top control is presented.
-
Key words:
- bell-less top /
- BF operation /
- charging control
点击查看大图
计量
- 文章访问数: 25
- HTML全文浏览量: 8
- PDF下载量: 0
- 被引次数: 0