PENG Ming-fu, YANG Yang-jun, LIU Hui-qian, CHEN Zi-qing, WANG Xiao-jiang. STUDY OF DISCONTINUOUS LEACHING PROCESS FOR VANADIUM BEARING CLINKER[J]. IRON STEEL VANADIUM TITANIUM, 2000, 21(3): 59-63.
Citation:
PENG Ming-fu, YANG Yang-jun, LIU Hui-qian, CHEN Zi-qing, WANG Xiao-jiang. STUDY OF DISCONTINUOUS LEACHING PROCESS FOR VANADIUM BEARING CLINKER[J]. IRON STEEL VANADIUM TITANIUM, 2000, 21(3): 59-63.
PENG Ming-fu, YANG Yang-jun, LIU Hui-qian, CHEN Zi-qing, WANG Xiao-jiang. STUDY OF DISCONTINUOUS LEACHING PROCESS FOR VANADIUM BEARING CLINKER[J]. IRON STEEL VANADIUM TITANIUM, 2000, 21(3): 59-63.
Citation:
PENG Ming-fu, YANG Yang-jun, LIU Hui-qian, CHEN Zi-qing, WANG Xiao-jiang. STUDY OF DISCONTINUOUS LEACHING PROCESS FOR VANADIUM BEARING CLINKER[J]. IRON STEEL VANADIUM TITANIUM, 2000, 21(3): 59-63.
The discontinuous roasted clinker leaching process for V2O3 production from converter vanadium bearing slag was introduced,The factors (temperature, time, number of times for leaching and washing)influencing leaching percentage were investigated. The results obtained from industrial production show the vanadium content in leaching solution can meet the requirement of the down stream process when the SV content in the residue after leaching and washing is decreased to <0 1%.