Volume 18 Issue 3
Sep.  1997
Turn off MathJax
Article Contents
Dang Yuchun. REBUILDING DESIGN OF FINISHED PRODUCT TRANSPORT SYSTEM FOR LIMESTONE QUARRY AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1997, 18(3): 56-59,73.
Citation: Dang Yuchun. REBUILDING DESIGN OF FINISHED PRODUCT TRANSPORT SYSTEM FOR LIMESTONE QUARRY AT PANGANG[J]. IRON STEEL VANADIUM TITANIUM, 1997, 18(3): 56-59,73.

REBUILDING DESIGN OF FINISHED PRODUCT TRANSPORT SYSTEM FOR LIMESTONE QUARRY AT PANGANG

  • Received Date: 1997-03-31
    Available Online: 2023-12-07
  • Publish Date: 1997-09-30
  • After the rebuilding aimed to solve the problems in the transport system of finished product for Limestone Quarry, the good results have been achieved, which effectively solved the prohlems such as frequent equipment faults, difficult repair, dropping and powder pollution of finished primary lime occurred during transportation, etc. and prolonged the repair period with the minimization of spare part consumption and the reduction of labor intensity.
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (15) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return