Yao Qiuyang, Chen Yong, Huang Daoxin. MOLTEN STEEL TEMPERATURE CONTROL DURING HIGH SPEED CONTINUOUS CASTING[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(2): 12-16.
Citation:
Yao Qiuyang, Chen Yong, Huang Daoxin. MOLTEN STEEL TEMPERATURE CONTROL DURING HIGH SPEED CONTINUOUS CASTING[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(2): 12-16.
Yao Qiuyang, Chen Yong, Huang Daoxin. MOLTEN STEEL TEMPERATURE CONTROL DURING HIGH SPEED CONTINUOUS CASTING[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(2): 12-16.
Citation:
Yao Qiuyang, Chen Yong, Huang Daoxin. MOLTEN STEEL TEMPERATURE CONTROL DURING HIGH SPEED CONTINUOUS CASTING[J]. IRON STEEL VANADIUM TITANIUM, 1999, 20(2): 12-16.
Improved molten steel temperature control at high casting speed of 1.8 m/min for Pangang casteris introduced.A lot of measures such as ladle insulation, preheating ladle, heating molten steel in LF and molten steel temperature adjustment with slab scrap, tundish insulation, used for controlling temperature drop are adopted.Tapping temperature of molten steel is decreased by 10~15℃ in comparison with conventional one.A satisfied result with ≤ 25℃ overheating degree of molten steel in tundish is achieved.